Adobe Stock
Adobe Stock
Pima County Transportation issued the following annoucement on Jan. 14.
Highlights from South Houghton Road Widening Project included lots of concrete work – a new 24" water valve is installed at north end of project; footing for pre-cast RCBC; slurry placement on pipe run; outlet pipe headwall; crews compact shading material for pipe run; and more concrete is placed on deck.
Original source can be found here.